Powered by Blogger.

Popular Posts

Categories

Followers

Second Menu

Blogroll

Pages

Recent Posts

Blogger templates

Related Posts Plugin for WordPress, Blogger...

Download

Blogger Tricks

Blogger Themes

PRODUCTION ENGINEER - Nilai, Negeri Sembilan

Wednesday, 4 January 2012


HAWKS Technologies (M) Sdn Bhd is manufacturer of mechanical valves which
operates under ISO and American Petroleum Industry standards. Our customers
comprise of the oil & gas, waterworks, petrochemical and power generation
companies located all over the world. Our focus is on people driven to
succeed. Quality candidate will have the opportunity of an excellent career
prospect through an intensive on the job training program provided by our
subject matter experts. In line with our continuous expansion plans, we are
seeking aggressive and dynamic candidates ti fill the following position:-

Position: PRODUCTION ENGINEER

Location: Lot 517, PT 3393, Jalan Nilai 7/17, Kawasan Perindustrian Nilai 7,
71800 Nilai, Negeri Sembilan, Malaysia

Requirements:

* Possess Degree in Mechanical Engineering or its related field

* MALE

* Preferably 2 years working experience related with valves.

* Good interpersonal and communication skills in English/Bahasa Malaysia.

* Self-motivated with good interpersonal and communication skills.

* Positive attitude and result orientated.

* Preferred spoken and written language: English, Bahasa Malaysia

* Competent in the use of Microsoft Office and AutoCad.

Interested applicants are invited to apply online or write in your detailed
resume with photograph, present and expected salary and contact number to:

Human Resource Department,
HAWKS TECHNOLOGIES (M) SDN BHD (803070-H)
Lot 517, PT 3393, Jalan Nilai 7/17, Kawasan Perindustrian Nilai 7,
71800 Nilai, Negeri Sembilan, Malaysia

Tel: 606 - 799 0731
Fax: 606 - 799 0040/0407

Email: zakiah.hawks@gmail.com

Closing Date: 08 January 2012

1 comments:

merit2005 13 January 2022 at 00:27  

Oil well drilling drill pipe wiper balls can wipe cement, fluids, debris, and separate liquids from drill pipes and tubing. You can use them to wipe drilling fluids and displacement fluids of any kind.

Fluids can be separated using drill pipe wiper balls and drill tubing and drill pipe can be removed of cement, fluids, and debris.

These drill pipe wiper balls are made from natural rubber and are temperature-resistant from 40°F (4°C) to 302°F (150°C). It can bend between 380 and 440%, so even small obstructions won’t be damaged.


Email: meritautomotive@gmail.com
Drill Pipe Wiper Balls
Drill Pipe Foam Wiper Ball
Drill Pipe Wiper Foam Balls
Merit DP Wiper Ball
Drill Pipe 5″-5-7/8″ Wiper Foam Balls
Drill pipes or tubing connections can easily accept our wiper balls, and multiple balls can be pumped if necessary. It passes easily through mechanical setting tools, diverters, and liner running tools.
In order to prevent scale from sticking to the ID of the drillpipe or workstring, wipe it with foam wiper balls. As a fluid separation measure and to facilitate sheath removal, foam wiper balls may be pumped behind cement.

Post a Comment

  © Blogger template On The Road by Ourblogtemplates.com 2009

Back to TOP